Which of the following is MOST effective in controlling
application maintenance?
A. Informing users of the status of changes
B. Establishing priorities on program changes
C. Obtaining user approval of program changes
D. Requiring documented user specifications for changes
Answer / guest
Answer: C
User approvals of program changes will ensure that changes
are correct as specified by the user and that they are
authorized. Therefore, erroneous or unauthorized changes are
less likely to occur, minimizing system downtime and errors.
Is This Answer Correct ? | 4 Yes | 3 No |
The MAJOR advantage of the risk assessment approach over the baseline approach to information security management is that it ensures: A. information assets are over protected. B. a basic level of protection is applied regardless of asset value. C. appropriate levels of protection are applied to information assets. D. an equal proportion of resources are devoted to protecting all information assets.
In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.
Of the following who is MOST likely to be responsible for network security operations? A. Users B. Security administrators C. Line managers D. Security officers
Which of the following would be of the LEAST value to an IS auditor attempting to gain an understanding of an organization's IT process? A. IT planning documents with deliverables and performance results B. Policies and procedures relating to planning, managing, monitoring and reporting on performance C. Prior audit reports D. Reports of IT functional activities
Which of these has the potential to improve security incident response processes? A. Review the incident response procedures. B. Post-mortem or post-event reviews by the security team. C. Getting the hot-site ready. D. Reviw the BCP plan every six months
Which of the following is a management technique that enables organizations to develop strategically important systems faster while reducing development costs and maintaining quality? A. Function point analysis B. Critical path methodology C. Rapid application development D. Program evaluation review technique
The primary goal of a web site certificate is: A. authentication of the web site to be surfed through. B. authentication of the user who surfs through that site. C. preventing surfing of the web site by hackers. D. the same purpose as that of a digital certificate.
An organization has contracted with a vendor for a turnkey solution for their electronic toll collection system (ETCS). The vendor has provided its proprietary application software as part of the solution. The contract should require that: A. a backup server be available to run ETCS operations with up-to-date data. B. a backup server be loaded with all the relevant software and data. C. the systems staff of the organization be trained to handle any event. D. source code of the ETCS application be placed in escrow.
An organization is considering installing a LAN in a site under construction. If system availability is the main concern, which of the following topologies is MOST appropriate? A. Ring B. Line C. Star D. Bus
During an audit of a reciprocal disaster recovery agreement between two companies, the IS auditor would be PRIMARILY concerned about: A. the soundness of the impact analysis. B. hardware and software compatibility. C. differences in IS policies and procedures. D. frequency of system testing.
A tax calculation program maintains several hundred tax rates. The BEST control to ensure that tax rates entered into the program are accurate is: A. an independent review of the transaction listing. B. a programmed edit check to prevent entry of invalid data. C. programmed reasonableness checks with 20 percent data entry range. D. a visual verification of data entered by the processing department.
In the ISO/OSI model, which of the following protocols is the FIRST to establish security for the user application? A. Session layer. B. Transport layer C. Network layer D. Presentation layer