Which of the following testing methods is MOST effective
during the initial phases of prototyping?

A. System

B. Parallel

C. Volume

D. Top-down

Answers were Sorted based on User's Feedback



Which of the following testing methods is MOST effective during the initial phases of prototyping? ..

Answer / guest

Answer: D

Top-down testing starts with the system's major functions
and works downwards. The initial emphasis when using
prototyping is to create screens and reports, thus shaping
most of the proposed system's features in a short period.
Volume and system testing is performed during final system
testing phases. Parallel testing is not needed necessarily,
especially if there's no old system to compare with.

Is This Answer Correct ?    3 Yes 0 No

Which of the following testing methods is MOST effective during the initial phases of prototyping? ..

Answer / an

D. Top-down

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

The PRIMARY objective of a logical access controls review is to: A. review access controls provided through software. B. ensure access is granted per the organization's authorities. C. walkthrough and assess access provided in the IT environment. D. provide assurance that computer hardware is protected adequately against abuse.

1 Answers  


Which of the following findings would an IS auditor be MOST concerned about when performing an audit of backup and recovery and the offsite storage vault? A. There are three individuals with a key to enter the area. B. Paper documents also are stored in the offsite vault. C. Data files, which are stored in the vault, are synchronized. D. The offsite vault is located in a separate facility.

1 Answers   Apple,


When a new system is to be implemented within a short time frame, it is MOST important to: A. finish writing user manuals. B. perform user acceptance testing. C. add last-minute enhancements to functionalities. D. ensure that code has been documented and reviewed.

1 Answers  


When an IS auditor obtains a list of current users with access to a WAN/LAN and verifies that those listed are active associates, the IS auditor is performing a: A. compliance test. B. substantive test. C. statistical sample. D. risk assessment.

1 Answers  


Which of the following is a management technique that enables organizations to develop strategically important systems faster while reducing development costs and maintaining quality? A. Function point analysis B. Critical path methodology C. Rapid application development D. Program evaluation review technique

1 Answers  






During which of the following steps in the business process reengineering should the benchmarking team visit the benchmarking partner? A. Observation B. Planning C. Analysis D. Adaptation

2 Answers  


In the course of performing a risk analysis, an IS auditor has identified threats and potential impacts. Next, an IS auditor should: A. identify and assess the risk assessment process used by management. B. identify information assets and the underlying systems. C. disclose the threats and impacts to management. D. identify and evaluate the existing controls.

1 Answers  


Which of the following is MOST directly affected by network performance monitoring tools? A. Integrity B. Availability C. Completeness D. Confidentiality

2 Answers  


With reference to the risk management process, which of the following statements is correct? A. Vulnerabilities can be exploited by a threat. B. Vulnerabilities are events with the potential to cause harm to IS resources. C. Vulnerability exists because of threats associated with use of information resources. D. Lack of user knowledge is an example of a threat.

1 Answers  


Which of the following is a function of an IS steering committee? A. Monitoring vendor controlled change control and testing B. Ensuring a separation of duties within the information's processing environment C. Approving and monitoring major projects, the status of IS plans and budgets D. Responsible for liaison between the IS department and the end users

1 Answers  


Which of the following groups should assume ownership of a systems development project and the resulting system? A. User management B. Senior management C. Project steering committee D. Systems development management

3 Answers  


Which of the following is a control to compensate for a programmer having access to accounts payable production data? A. Processing controls such as range checks and logic edits B. Reviewing accounts payable output reports by data entry C. Reviewing system-produced reports for checks (cheques) over a stated amount D. Having the accounts payable supervisor match all checks (cheques) to approved invoices

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)