Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


16 questions out of 55 were from the book GUPTA N GUPTA
OBJECTIVE of civil engineering. Total ques were 4 ques from
hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics,
6 from transportation, 5 from engineering drawing.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

what is the procedure to clean the mivan technically?

1 Answers  


# 1, What should be the Maximum Water observation of wood # 2. Is Alluminium is an alloy or not

2 Answers   Brigade,


with out excell knowledge primavera is possible or not?

2 Answers  


What is full form of SNF base in concrete mix design for admixture percentage?

2 Answers  


What is the difference between RCC & PCC?

6 Answers   DLF, Jaypee, L&T,


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

0 Answers  


HOw much % of premium on DSR-2013 currently

0 Answers   NICE,


what are the values of compressieve strenght?

0 Answers  


Common strng of kg/m3 building materials

1 Answers   Godway,


1) what is the use of pin and plate vibrators during slab casting? 2) how much cement bags are required for 1sqm 4inch brick wall? 3) Is it viable to provide overlap at column , beam & slab junction. if no why? 4) if bar dia is changing in column reinforcement , which dia bars overlap is considered? 5) what is isolated and ecentric footing?

4 Answers  


What is meant by cartesian coordinate system?

0 Answers  


how much binding wire is reqd for 1 MT

8 Answers   IVRCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)