Of the following, the MAIN purpose for periodically testing
offsite backup facilities is to:

A. ensure the integrity of the data in the database.

B. eliminate the need to develop detailed contingency plans.

C. ensure the continued compatibility of the contingency
facilities.

D. ensure that program and system documentation remains current.



Of the following, the MAIN purpose for periodically testing offsite backup facilities is to: A. ..

Answer / guest

Answer: C

The main purpose of offsite hardware testing is to ensure
the continued compatibility of the contingency facilities.
Specific software tools are available to ensure the ongoing
integrity of the database. Contingency plans should not be
eliminated and program and system documentation should be
reviewed continuously for currency.

Is This Answer Correct ?    6 Yes 2 No

Post New Answer

More CISA Certification Interview Questions

The PRIMARY objective of a business continuity and disaster recovery plan should be to: A. safeguard critical IS assets. B. provide for continuity of operations. C. minimize the loss to an organization. D. protect human life.

2 Answers  


Which of the following tests confirm that the new system can operate in its target environment? A. Sociability testing B. Regression testing C. Validation testing D. Black box testing

1 Answers  


Which of the following is a substantive audit test? A. Verifying that a management check has been performed regularly B. Observing that user IDs and passwords are required to sign on the computer C. Reviewing reports listing short shipments of goods received D. Reviewing an aged trial balance of accounts receivable

1 Answers  


The PRIMARY purpose of audit trails is to: A. improve response time for users. B. establish accountability and responsibility for processed transactions. C. improve the operational efficiency of the system. D. provide useful information to auditors who may wish to track transactions.

1 Answers  


Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review

1 Answers  






The BEST time to perform a control self-assessment involving line management, line staff and the audit department is at the time of: A. compliance testing. B. the preliminary survey. C. substantive testing. D. the preparation of the audit report.

1 Answers  


Which of the following procedures should be implemented to help ensure the completeness of inbound transactions via electronic data interchange (EDI)? A. Segment counts built into the transaction set trailer B. A log of the number of messages received, periodically verified with the transaction originator C. An electronic audit trail for accountability and tracking D. Matching acknowledgement transactions received to the log of EDI messages sent

2 Answers  


An IS auditor, performing a review of an application?s controls, discovers a weakness in system software, which could materially impact the application. The IS auditor should: A. Disregard these control weaknesses as a system software review is beyond the scope of this review. B. Conduct a detailed system software review and report the control weaknesses. C. Include in the report a statement that the audit was limited to a review of the application?s controls. D. Review the system software controls as relevant and recommend a detailed system software review.

1 Answers  


An IS auditor should be able to identify and evaluate various types of risks and their potential effects. Which of the following risks is associated with authorized program exits (trap doors)? A. Inherent B. Detection C. Audit D. Error

2 Answers  


To help mitigate the effects of a denial of service attack, which mechanism can an Internet service provider (ISP) use to identify Internet protocol (IP) packets from unauthorized sources? A. Inbound traffic filtering B. Rate limiting C. Reverse address lookup D. Network performance monitoring

2 Answers  


Which of the following is MOST effective in controlling application maintenance? A. Informing users of the status of changes B. Establishing priorities on program changes C. Obtaining user approval of program changes D. Requiring documented user specifications for changes

1 Answers  


Receiving an EDI transaction and passing it through the communications interface stage usually requires: A. translating and unbundling transactions. B. routing verification procedures. C. passing data to the appropriate application system. D. creating a point of receipt audit log.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)