In reviewing the IS short-range (tactical) plan, the IS
auditor should determine whether:

A. there is an integration of IS and business staffs within
projects.

B. there is a clear definition of the IS mission and vision.

C. there is a strategic information technology planning
methodology in place.

D. the plan correlates business objectives to IS goals and
objectives.



In reviewing the IS short-range (tactical) plan, the IS auditor should determine whether: A. the..

Answer / guest

Answer: A

The integration of IS and business staff in projects is an
operational issue and should be considered while reviewing
the short-range plan. A strategic plan would provide a
framework for the IS short-range plan. Choices B, C, and D
are areas covered by a strategic plan.

Is This Answer Correct ?    10 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

An IS auditor recommends that an initial validation control be programmed into a credit card transaction capture application. The initial validation process would MOST likely: A. check to ensure the type of transaction is valid for that card type. B. verify the format of the number entered then locate it on the database. C. ensure that the transaction entered is within the cardholder's credit limit. D. confirm that the card is not shown as lost or stolen on the master file.

1 Answers  


Is it appropriate for an IS auditor from a company that is considering outsourcing its IS processing to request and review a copy of each vendor's business continuity plan? A. Yes, because the IS auditor will evaluate the adequacy of the service bureau's plan and assist his/her company in implementing a complementary plan. B. Yes, because, based on the plan, the IS auditor will evaluate the financial stability of the service bureau and its ability to fulfill the contract. C. No, because the backup to be provided should be specified adequately in the contract. D. No, because the service bureau's business continuity plan is proprietary information.

1 Answers  


In planning an audit, the MOST critical step is the identification of the:

6 Answers   Oracle,


Which of the following development methods uses a prototype that can be updated continually to meet changing user or business requirements? A. Data-oriented development (DOD) B. Object-oriented development (OOD) C. Business process reengineering (BPR) D. Rapid application development (RAD)

1 Answers  


Which of the following reports should an IS auditor use to check compliance with a service level agreement (SLA) requirement for uptime? A. Utilization reports B. Hardware error reports C. System logs D. Availability reports

2 Answers  






If a database is restored using before-image dumps, where should the process be restarted following an interruption? A. Before the last transaction B. After the last transaction C. The first transaction after the latest checkpoint D. The last transaction before the latest checkpoint

2 Answers   CISA, IBM, Oracle,


Programs that can run independently and travel from machine to machine across network connections, with the ability to destroy data or utilize tremendous computer and communication resources, are referred to as: A. trojan horses. B. viruses. C. worms. D. logic bombs.

7 Answers  


Which of the following controls is LEAST likely to detect changes made online to master records? A. Update access to master file is restricted to a supervisor independent of data entry. B. Clerks enter updates online and are finalized by an independent supervisor. C. An edit listing of all updates is produced daily and reviewed by an independent supervisor. D. An update authorization form must be approved by an independent supervisor before entry.

1 Answers  


Which of the following is an objective of a control self-assessment (CSA) program? A. Concentration on areas of high risk B. Replacement of audit responsibilities C. Completion of control questionnaires D. Collaborative facilitative workshops

1 Answers  


Change management procedures are established by IS management to: A. control the movement of applications from the test environment to the production environment. B. control the interruption of business operations from lack of attention to unresolved problems. C. ensure the uninterrupted operation of the business in the event of a disaster. D. verify that system changes are properly documented.

1 Answers  


In a client-server architecture, a domain name service (DNS) is MOST important because it provides the: A. address of the domain server. B. resolution service for the name/address. C. IP addresses for the Internet. D. domain name system.

3 Answers  


A programmer included a routine into a payroll application to search for his/her own payroll number. As a result, if this payroll number does not appear during the payroll run, a routine will generate and place random numbers onto every paycheck. This routine is known as: A. scavenging. B. data leakage. C. piggybacking. D. a trojan horse.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)