Which of the following is a control to detect an
unauthorized change in a production environment?

A. Denying programmers access to production data.

B. Requiring change request to include benefits and costs.

C. Periodically comparing control and current object and
source programs.

D. Establishing procedures for emergency changes.



Which of the following is a control to detect an unauthorized change in a production environment? ..

Answer / guest

Answer: C

Running the code comparison program on the control and
current object and source programs allows for the detection
of unauthorized changes in the production environment.
Choices A, B and D are preventive controls that are
effective as long as they are being applied consistently.

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More CISA Certification Interview Questions

Which of the following techniques would provide the BEST assurance that the estimate of program development effort is reliable? A. Function point analysis B. Estimates by business area C. A computer-based project schedule D. An estimate by experienced programmer

1 Answers  


In a small organization, an employee performs computer operations and, when the situation demands, program modifications. Which of the following should the IS auditor recommend? A. Automated logging of changes to development libraries B. Additional staff to provide separation of duties C. Procedures that verify that only approved program changes are implemented D. Access controls to prevent the operator from making program modifications

1 Answers  


The document used by the top management of organizations to delegate authority to the IS audit function is the: A. long-term audit plan. B. audit charter. C. audit planning methodology. D. steering committee minutes.

1 Answers  


Which of the following ensures completeness and accuracy of accumulated data? A. Processing control procedures B. Data file control procedures C. Output controls D. Application controls

1 Answers  


An IS auditor reviewing database controls discovered that changes to the database during normal working hours were handled through a standard set of procedures. However, changes made after normal hours required only an abbreviated number of steps. In this situation, which of the following would be considered an adequate set of compensating controls? A. Allow changes to be made only with the DBA user account. B. Make changes to the database after granting access to a normal user account C. Use the DBA user account to make changes, log the changes and review the change log the following day. D. Use the normal user account to make changes, log the changes and review the change log the following day.

1 Answers  






Which of the following is the most important element in the design of a data warehouse? A. Quality of the metadata B. Speed of the transactions C. Volatility of the data D. Vulnerability of the system

1 Answers  


An IS auditor's MAJOR concern as a result of reviewing a business process reengineering (BPR) project should be whether the: A. newly designed business process has key controls in place. B. changed process will affect organization structure, finances and personnel. C. roles for suppliers have been redefined. D. process has been documented before and after reengineering.

1 Answers  


The review of router access control lists should be conducted during a/an: A. environmental review. B. network security review. C. business continuity review. D. data integrity review.

1 Answers  


IS auditors are MOST likely to perform compliance tests of internal controls if, after their initial evaluation of the controls, they conclude that: A. a substantive test would be too costly. B. the control environment is poor. C. inherent risk is low. D. control risks are within the acceptable limits.

2 Answers  


Business continuity/disaster recovery is PRIMARILY the responsibility of: A. IS management. B. business unit managers. C. the security administrator. D. the board of directors.

1 Answers  


A large chain of shops with EFT at point-of-sale devices has a central communications processor for connecting to the banking network. Which of the following is the BEST disaster recovery plan for the communications processor? A. Offsite storage of daily backups B. Alternative standby processor onsite C. Installation of duplex communication links D. Alternative standby processor at another network node

1 Answers  


The purpose of debugging programs is to: A. generate random data that can be used to test programs before implementing them. B. protect valid changes from being overwritten by other changes during programming. C. define the program development and maintenance costs to be include in the feasibility study. D. ensure that abnormal terminations and coding flaws are detected and corrected.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)