Which of the following is the MOST important function to be
performed by IS management when a service has been outsource?
A. Ensuring that invoices are paid to the provider
B. Participating in systems design with the provider
C. Renegotiating the provider's fees
D. Monitoring the outsourcing provider's performance
Answers were Sorted based on User's Feedback
Answer / guest
Answer: D
In an outsourcing environment, the company is dependent on
the performance of the service provider. Therefore, it is
critical the outsourcing provider's performance be monitored
to ensure that services are delivered to the company as
required. Payment of invoices is a finance function, which
would be done per contractual requirements. Participating in
systems design is a by-product of monitoring the outsourcing
provider's performance, while renegotiating fees is usually
a one-time activity.
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / guest
D. Monitoring the outsourcing provider's performance
| Is This Answer Correct ? | 3 Yes | 0 No |
Which of the following is the PRIMARY safeguard for securing software and data within an information processing facility? A. Security awareness B. Reading the security policy C. Security committee D. Logical access controls
Digital signatures require the: A. signer to have a public key and the receiver to have a private key. B. signer to have a private key and the receiver to have a public key. C. signer and receiver to have a public key. D. signer and receiver to have a private key.
Which of the following choices BEST ensures the effectiveness of controls related to interest calculation inside an accounting system? A. Re-performance B. Process walk-through C. Observation D. Documentation review
A proposed transaction processing application will have many data capture sources and outputs in both paper and electronic form. To ensure that transactions are not lost during processing, the IS auditor should recommend the inclusion of: A. validation controls. B. internal credibility checks. C. clerical control procedures. D. automated systems balancing.
Which of the following groups should assume ownership of a systems development project and the resulting system? A. User management B. Senior management C. Project steering committee D. Systems development management
What is a risk associated with attempting to control physical access to sensitive areas, such as computer rooms, through card keys, locks, etc.? A. Unauthorized individuals wait for controlled doors to open and walk in behind those authorized. B. The contingency plan for the organization cannot effectively test controlled access practices. C. Access cards, keys, and pads can be easily duplicated allowing easy compromise of the control. D. Removing access for people no longer authorized is complex.
The PRIMARY benefit of database normalization is the: A. minimization redundancy of information in tables required to satisfy users? needs. B. ability to satisfy more queries. C. maximization of database integrity by providing information in more than one table. D. minimization of response time through faster processing of information.
The purpose of debugging programs is to: A. generate random data that can be used to test programs before implementing them. B. protect, during the programming phase, valid changes from being overwritten by other changes. C. define the program development and maintenance costs to be include in the feasibility study. D. ensure that program abnormal terminations and program coding flaws are detected and corrected.
Which is the first software capability maturity model (CMM) level to include a standard software development process? A. Initial (level 1) B. Repeatable (level 2) C. Defined (level 3) D. Optimizing (level 5)
A critical function of a firewall is to act as a: A. special router that connects the Internet to a LAN. B. device for preventing authorized users from accessing the LAN. C. server used to connect authorized users to private trusted network resources. D. proxy server to increase the speed of access to authorized users.
A primary reason for an IS auditor's involvement in the development of a new application system is to ensure that: A. adequate controls are built into the system. B. user requirements are satisfied by the system. C. sufficient hardware is available to process the system. D. data are being developed for pre-implementation testing of the system.
When a systems development life cycle (SDLC) methodology is inadequate, the MOST serious immediate risk is that the new system will: A. be completed late. B. exceed the cost estimates. C. not meet business and user needs. D. be incompatible with existing systems.