Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


The MOST significant level of effort for business continuity
planning (BCP) generally is required during the:

A. testing stage.

B. evaluation stage.

C. maintenance stage.

D. early stages of planning.

Answers were Sorted based on User's Feedback



The MOST significant level of effort for business continuity planning (BCP) generally is required d..

Answer / guest

Answer: D

A company in the early stages of a BCP will incur the most
significant level of program development effort, which will
level out as the BCP moves into maintenance, testing and
evaluation stages. It is during the planning stage that an
IS auditor will play an important role in obtaining senior
management's commitment to resources and assignment of BCP
responsibilities.

Is This Answer Correct ?    10 Yes 0 No

The MOST significant level of effort for business continuity planning (BCP) generally is required d..

Answer / aravind

Answer is D

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

While reviewing an ongoing project, the IS auditor notes that the development team has spent eight hours of activity on the first day against a budget of 24 hours (over three days). The projected time to complete the remainder of the activity is 20 hours. The IS auditor should report that the project: A. is behind schedule. B. is ahead of schedule. C. is on schedule. D. cannot be evaluated until the activity is completed.

1 Answers  


The Primary purpose of audit trails is to

6 Answers  


IS management has recently informed the IS auditor of its decision to disable certain referential integrity controls in the payroll system to provide users with a faster report generator. This will MOST likely increase the risk of: A. data entry by unauthorized users. B. a nonexistent employee being paid. C. an employee receiving an unauthorized raise. D. duplicate data entry by authorized users.

1 Answers  


A company has recently upgraded its purchase system to incorporate EDI transmissions. Which of the following controls should be implemented in the EDI interface in order to provide for efficient data mapping? A. Key verification B. One-for-one checking C. Manual recalculations D. Functional acknowledgements

1 Answers  


A hub is a device that connects: A. two LANs using different protocols. B. a LAN with a WAN. C. a LAN with a metropolitan area network (MAN). D. two segments of a single LAN.

2 Answers  


An IS auditor performing an independent classification of systems should consider a situation where functions could be performed manually at a tolerable cost for an extended period of time as: A. critical. B. vital. C. sensitive. D. noncritical.

1 Answers  


When a systems development life cycle (SDLC) methodology is inadequate, the MOST serious immediate risk is that the new system will: A. be completed late. B. exceed the cost estimates. C. not meet business and user needs. D. be incompatible with existing systems.

1 Answers  


Congestion control is BEST handled by which OSI layer? A. Data link B. Session layer C. Transport layer D. Network layer

3 Answers  


During an audit of the tape management system at a data center, an IS auditor discovered that parameters are set to bypass or ignore the labels written on tape header records. The IS auditor also determined that effective staging and job setup procedures were in place. In this situation, the IS auditor should conclude that the: A. tape headers should be manually logged and checked by the operators. B. staging and job setup procedures are not appropriate compensating controls. C. staging and job setup procedures compensate for the tape label control weakness. D. tape management system parameters must be set to check all labels.

1 Answers  


The most common problem in the operation of an intrusion detection system (IDS) is: A. the detection of false positives. B. receiving trap messages. C. reject error rates. D. denial-of-service attacks.

1 Answers   ABC,


Which of the following is a feature of an intrusion detection system (IDS)? A. Gathering evidence on attack attempts B. Identifying weakness in the policy definition C. Blocking access to particular sites on the Internet D. Preventing certain users from accessing specific servers

1 Answers  


Which of the following is a measure of the size of an information system based on the number and complexity of a system's inputs, outputs and files? A. Program evaluation review technique (PERT) B. Rapid application development (RAD) C. Function point analysis (FPA) D. Critical path method (CPM)

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)