Sir,
I'm P.Ravi Kumar want to previous mechanical Question
Papers for rrb exam
No Answer is Posted For this Question
Be the First to Post Answer
what difference between centrifugal and reciprocating pump.
What is plant load factor?
What causes crankcase explosion?
when eating ice cream, why the spoon of wooden material is always straight & plastic spoon is always convex in shape?
want to drdo paper for the post of tech.asstt.(mech)
what is the function of primary pump and secondary pump in HVAC plant.?
is there a future for a mechanical er. in supplier development field ?
WHAT IS PROTECTION AND INTERLOCK ROTECTION?
List the energy saving opportunities in air compressor system.
What is the expansion valve in HVAC & How it works ????????????
Explain the causes of the exhaust valve leakage.
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb