Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When designing a flat switched network you can have:

A. the same number of IP and IPX nodes without performance
degradation

B. more IP than IPX nodes on the same segment

C. more IPX than IP nodes on the same segment

D. more AppleTalk than IP nodes on the same segment



When designing a flat switched network you can have: A. the same number of IP and IPX nodes witho..

Answer / guest

Answer: A

This is a very deceiving question because all the answers
can be right. Our best guess would be A. If you use the
table below, you can see that in a mixed environment that
the maximum number of workstations that you can use per
segment shouldn?t exceed 200. If that?s the case, we could
have 150 IP workstations and 50 IPX workstations, which
would make B correct. Or, we could have 150 IPX workstations
and 50 IP workstations, which would make C correct. You get
the picture by now. So, we chose A in assuming that you
could have 100 IP workstations and 100 IPX workstations
without performance degradation.

Protocol Maximum Number of Workstations per segment

IP 500

IPX 300

AppleTalk 200

NetBIOS 200

Mixed 200

However, make note of this for the exam: If answer B said
?more IP than IPX nodes on the same segment without
performance degradation? we would have chosen that answer
because there is less broadcast traffic with IP nodes.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More CCDA Interview Questions

The following are examples of proactive network management except: A. Allocate sufficient staff time B. Troubleshooting and solving system problems C. Generate reports D. Identify Problems

1 Answers  


A device has 2 synchronous ports, 16 asynchronous ports, and one ethernet port. What is this device most likely to be? A. CSU/DSU B. Access Server C. Multiplexer D. ISDN Terminal Adapter

2 Answers  


ISDN is referenced by a suite of ITU-T (International Telecommunication Union Telecommunication Standardization Sector) standards encompassing what three layers of the OSI reference model? A. Physical B. Data Link (LAPD) C. Data Link (RMON) D. Network (Q.930 and Q.931)

1 Answers  


When would you suggest static routes to your customers? A. When scalability is important B. When bandwidth is limited C. When the network will be changing frequently D. Always suggest static routes

1 Answers  


What happens to performance if the maximum MTU (Maximum Transmission Unit) size is used? A. Performance increases B. Performance decreases C. Performance stays the same D. Performance has nothing to do with the MTU

1 Answers  


When is the route to a node determined in an SRB (Source Route Bridging) Token Ring network? A. Before any data is transmitted B. After the data is transmitted C. During the transmission of data D. After the first frame is transmitted

1 Answers  


how many switches can be cascaded

2 Answers  


What address is 12 hexadecimal, resides in the Data-Link layer, and is burned in the ROM by the manufacturer.

2 Answers  


In which category should Frame Relay be placed within the following Job Aid? Name of Protocol Type of Protocol # of Users # of Hosts or Servers Comments

1 Answers  


when ever we apply show flash comand on the router it givesthat informatin router#show flash syatem file directory: file length name/status 1 8121000 c2500-js-L.112-18.bin what does it nean plz help i have read it from book but not bale to understand i am looking towards u for the help

1 Answers   IBM,


What are metrics used with IGRP? A. Ticks B. Load C. Hops D. Delay

1 Answers  


When doing an RFP (Request for Purchase) for a customer, at what step do you reiterate your solution and the customer requirements? A. Design Requirements B. Design Solution C. Summary D. Appendices

1 Answers  


Categories