When doing an RFP (Request for Purchase) for a customer, at
what step do you reiterate your solution and the customer
requirements?

A. Design Requirements

B. Design Solution

C. Summary

D. Appendices



When doing an RFP (Request for Purchase) for a customer, at what step do you reiterate your solutio..

Answer / guest

Answer: C

When doing an RFP (Request for Purchase) for a customer, you
reiterate your solution and the customer requirements at the
Summary step. See our ?CCDA Memorization Lists? under the
heading, ?Preparing a Design Document?

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More CCDA Interview Questions

With Centralized Routing, each node must determine and maintain its routing information independently? A. True B. False

1 Answers  


Which of the following three protocols replace SDLC? A. 802.2 B. HDLC C. QLLC D. X.25

1 Answers  


The following are examples of proactive network management except: A. Allocate sufficient staff time B. Troubleshooting and solving system problems C. Generate reports D. Identify Problems

1 Answers  


What type of address is analyzed by a Layer 2 switch? A. network address B. MAC and network address C. Protocol type, MAC, and network address D. MAC address

2 Answers  


In which category should Frame Relay be placed within the following Job Aid? Name of Protocol Type of Protocol # of Users # of Hosts or Servers Comments

1 Answers  


How does the Spanning Tree Protocol (STP) prevent bridging loops? A. By not allowing any redundant paths within the network B. By calculating the metrics of each path C. By detecting and logically blocking redundant paths from the network D. By creating virtual LANS

3 Answers   HCL,


What is the first step in diagramming packet flow for the terminals within a network? A. Identify the end user nodes of all the terminals B. Figure out the speed of all the servers C. Find out where all the routers are located D. Find out where all the switched are located

3 Answers  


It is not necessary to build an entire network to prove your network design. A. True B. False

1 Answers  


Match the following routing techniques with the correct descriptions: A. Static Routing 1. Mandatory configuration B. Dynamic Routing 2. No route updates 3. Can better tolerate failures 4. Sends update when topology changes 5. Path is determined by the router 7. Traffic is reduced

1 Answers  


What PPP frame initiates the network layer protocols to be used during a connection?

1 Answers  


Which two statements correctly identify considerations to take into account when deciding on campus QoS Design elements ?

1 Answers   Pari Networks,


What is an advantage of CHAP over PAP? A. Passwords are stored on separate servers in encrypted form B. CHAP sends passwords unencrypted to save connection time C. CHAP does not attempt to verify whether the user is authorized to access the requested resource D. ID?s and passwords are automatically stored in cache

1 Answers  


Categories