Please explain me v-model clearly i want to know how it
works and want to know how it use in real time on a project
please tell me its urgent and important for me
understand .Please tell me my mail id is Chiku_69@yahoo.in
Thank u
Answer / Sudarshan Kumar
The V-Model, also known as the Verification and Validation Model, is a software development life cycle model that corresponds to the waterfall model. It is used for testing and ensuring the quality of software products.nnThe V-Model consists of two phases: Verification and Validation:n1. Verification Phase:n - System Requirement Specification (SRS): A detailed description of what the system should do.n - High-Level Design (HLD): The overall design of the system.n - Low-Level Design (LLD): The detailed design of the system's modules and components.n - Implementation: Writing and coding the software according to the design specifications.n2. Validation Phase:n - Integration Testing: Verifying that all the individual modules work together correctly.n - System Testing: Testing the complete system under realistic conditions to ensure it meets all requirements.nnIn real-time projects, the V-Model is used for quality assurance and testing purposes. It helps to identify errors or issues early in the development process, making it easier to correct them. By following the V-Model, developers can produce high-quality software that functions as expected.nnEmail sent to Chiku_69@yahoo.in
| Is This Answer Correct ? | 0 Yes | 0 No |
Hi Everybody could you please send me the ISTQB Material to my mail id sravanthireddyr@gmail.com Thanking you in advance
what is the difference between quality assurence and quality control
what is difference between Sanity testing and Smoke testing?
which are the mandatory fields in QC while rising new bug??
How we can explain a bug which may arrive at the time of testing? Explain that bug in details?
what is effect variance ,Budget variance , Schedule Variance , Defect Density ?
How does your preferred work style work with the ideal test-manager role that you just described? What is different between the way you work and the role you described?
A bank application with From a/c, To a/c, amount and a submit button - What are the conditions that you write for it.
do a new defect is required to log for slight variation in steps on defect retest or the defect can be re open
if u find a bug and reported to devoloper, but he is not agree with ur openion what u will do,how u convince to them
Loop Testing Comes Under 1. White box Testing 2. Block Box Testing 3. Green Box Testing 4. Yellow Box Testing
What are the uses of test plans? What is the need of test plans and explain their significance