Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is sevice settings for mccb?How can be it setted?



what is sevice settings for mccb?How can be it setted?..

Answer / mukund

it depend which mccb you have most hase thermal and
megnetic ttrip setting for thermal you cand set may 110 to
120 % of full load amp. and megnetic 3 to 10 time of FLA go
with less time suppose 3 time if mccb trip when load
connected increase little higher

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

I have 30 kw motor load & i have selected 10 kvar capacitor bank for power factor improvement.my existing p.f is 0.85 & proposed p.f is 0.99 so ,is it right selection? 2 nd question how to connect c.bank whether in delta or star connection & how to decide it?

1 Answers  


If a capacitor bank is having rating 750kvar for 6.6kv. Then for 3.3kv how much will be the rating of capacitor bank.

1 Answers   OCL,


what is the equation of insulating resistance of motor???

1 Answers   Birla,


My question is abt backlog.I had dropped one subject in my second year, and completed this subject in the 3rd attempt, so how many backlogs i have got?1 or 3?plz sujjest the answer as soon as possible

0 Answers  


could mail me the question papers for the test.

1 Answers   ONGC,


difference between ceiling fan

24 Answers   Altius Technologies, Raisoni, TCS, Uni Deritend,


1.dg on load alarm/stop alarm... 2.dg on load. piu alarm alarm kaise chek krte hai

0 Answers   GTL,


What is meant by SPS Aluminium pipe in substations? Anyone knows whats this?

1 Answers   Amec,


which cable is used for 15 Hp monoblock pump 3phase and service wire Distance is 210 feet please tell me cable size Armaured

0 Answers  


For my plant the electricity department charging some amount for t/f losses. May i know what are transformer losses

1 Answers   L&T,


How 3 phase invertor works?

0 Answers   Aero Ltd,


Describe the test procedure to determine the vector group

0 Answers   MPSEB,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)