Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


If you don’t have coal, salt and copper, then how would you
earth your connection temporarily at a camp site.?

Answers were Sorted based on User's Feedback



If you don’t have coal, salt and copper, then how would you earth your connection temporarily at ..

Answer / muthu

Salt and coal are require to reduce the earth resistance
hence it may or may not required for all soil.

The copper is a one of the conductor ..If the copper is not
there we can use other alternative conductor such as steel
or aluminium

Is This Answer Correct ?    19 Yes 3 No

If you don’t have coal, salt and copper, then how would you earth your connection temporarily at ..

Answer / kasif khan

With what respect you are asking?

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

which site/city in India has all three(thremal,Hydal and Nuclear)power generaton facilities?

2 Answers  


Relay setting for earth fault of reciprocating and centrifugal compressor motor feeder.Setting will be different or same?

1 Answers   Reliance,


how can we minimize the off load losses of a distribution transformer which is required to be energized 24x7 ?? capacity of the T/F is 1250 KVA and off load losses are around 2.0 KW.. can we use capacitor bank at the secondary of such a T/F to overcome off load losses? please elaborate briefly...thanks

2 Answers  


parallel operation for tansformer which condition fill fil for that

11 Answers   ITC Infotech, Suzlon,


WHAT IS THE MEANING CREEPAGE DISTANCE

1 Answers  


i am completed in B.E(Electrical and Electronics Engineering) with 8 months experience in Quality Control Engineer at Bharathi Industries,Coimbatore.

0 Answers  


In view of Electrical Engg. What is the use of SCR(Silicon control rectifier)

11 Answers  


can induction motor becomes as a generator. if yes how it is possible. if there is a squirrel cage rotor.

6 Answers  


what factor is necessary during design of HT & LT MOTORS.

2 Answers   ABB, L&T,


in star-delta tranformer,if the input of star connection is 400/7v 3 kva then what is the output of delta connection?

0 Answers   Elicon,


can any tell me how to do wiring connection in L&T 3ph 4wire E301 CT operated energy meter, what is P1,P2,P3,P0. M1,M2,M3, L1,L2,L3.

2 Answers   Bhartiya International,


do you know measure the earth resistance?explain

1 Answers   Dalkia,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)