can u tell me what are the subjects involved in group I and
II and how i prepare for the exam


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Engineering AllOther Interview Questions

A company canteen needs an automated system for its food and beverage management. The canteen receives food and beverage items from different distributors. All the non perishable items are stored in the store-room and the perishable items are put in the fridge. The manager should be able to add, delete or update food and beverage items onto the system and perishable and non perishable item details are to be stored separately. Both waiters and the cooks should be able to update the perishable items, but only the cooks should be allowed to update the non perishable items. Both cooks and waiters are not allowed to add or delete any items that are entered. identify the Schema, Table , Fields

0 Answers   Accenture,


i want a program in c# for 100 or for a number greater than 100.....pls help

0 Answers  


Index of an Array containing 'n' aliment varies from________to_______

0 Answers  


Why is using C language

0 Answers   IOCL,


program for inter process communicatin using message sharing in unix c

0 Answers  






A number when divided by D leaves a remainder of 8 and when divided by 3D leaves a remainder of 21 . What is the remainder left, when twice the number is divided by 3D?

2 Answers   TCS,


I an doing Engineering in IT(4th year). i want to know what is the scope or .NET and Linux, and which is better for carrier

0 Answers  


what is test initiation?can anybody post the answer urgently?

0 Answers  


How do aeroplanes fly? Why can some fly up-side down?

0 Answers  


difference between java programming and c programming??

1 Answers  


good morning! can u briefly explain the concept of syllolism and wat it mean?

0 Answers   BSRB,


sir i m reject two time in u.s in spring intake now im taking a date of 1july-2010 in fall intake &im competed my bachlor degree(chem) in jun-2009 so what answer i give to visa officer ask me a what r u doing last 1-year bcoz i have no work expirience

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)