How would you supply power to a village which is very far from
a sub-station and has only a 11kV line running near by?
Answers were Sorted based on User's Feedback
Answer / abdur rahaman
First of all transmit the 11 kv line upto the village by taking taping from the nearest point. After that just using 11kv /440v distribution transformer we can supply power.
Is This Answer Correct ? | 6 Yes | 1 No |
take a tapping from 11 kv feeder and bring it near by the village with help of overhead lines. then with help of a distribution transformer(11kv/415V) tap it and supply it to the village.depending on your village load select transformer rating.
Is This Answer Correct ? | 2 Yes | 0 No |
Explain and give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?
in wind mill use 2100 kw asychronous generator ( induction generator ) rotor voltage : 3300,stator voltage : 690, rpm : 1511 type : MRL063E04 ' we check rotor resistance magger value found following. R-EARTH - 00 M.OHM,Y-EARTH-34 M.OHM,B-EARTH- 33M.OHM R-Y: 31 M.OHM, Y-B: 00 M.OHM,B-R :33 M.OHM HOW CAN I TAKE DECISION?pls ans. quickly
1.Is there any difference between terminologies,HT-HV <- LV? 2.What is the highest transmission voltage level in india?
what are the disadvantages of low power factor
Are you connected Transformer neutral eathing with it's body earthing or earthing met of switch yard.? Yes or No ? why ?
why Y CONNECTION IS BETTER INTERMS OF EFFICIENCY AND P.F FOR A LAOD LESS THAN 40% AND WHY AFTER DELTA IS BETTER FOR > 40%
If there is volagte between earth and neutral, what should be the reason ? and solution * What should be allowable limit in case, if the voltage between earth and neutral exist ? / OR what is limit for safe voltage between earth and neutral?
all electricals questions
Double Busbar Scheme for outdoor switch yard system (132kv) step up power plant Hi friends 1. in this system both busbars energized all the time. 2. what is the meaning of main BB and transfer BB, 3. step up transformer connect main bus bar all the time or both BB connected through DS switch . 4.bus sectionalization means ? thank you.
why the generator operating along with the infinte bus bar should never be under_excited?
why it is necessary to short and ground of a current transformer secondary side?
What happen when neutral point connected to core balance current transformer? (Neutral point of an alternator of a 180KVA DG. Neutral point connected to CBCT means enter to the CBCT)
0 Answers Great Eastern Energy Corporation Ltd,