Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=

Answers were Sorted based on User's Feedback



Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=..

Answer / subu

2+6+7-3=12

answer is 12

Is This Answer Correct ?    47 Yes 0 No

Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=..

Answer / soumya

2+6+7-3=12

Is This Answer Correct ?    31 Yes 0 No

Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=..

Answer / feedow

2+6+7-3
=12

Is This Answer Correct ?    17 Yes 0 No

Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=..

Answer / prashantl.com

its 12

Is This Answer Correct ?    1 Yes 0 No

Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=..

Answer / bharath

pls give the answer and the steps..

Is This Answer Correct ?    4 Yes 8 No

Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=..

Answer / dodz

373/7 give u remainder = 2
+
round(5.8)will giv u ans = 6

+

Truncate 7...............=7

+

round(3.4) = 3

Answer is 18....

Is This Answer Correct ?    15 Yes 36 No

Post New Answer

More General Aptitude Interview Questions

Which of the following appointments is not made by the President of India? a) Speaker of the LOk Sabha. b) Chief of Air Staff c) Chief of Army

3 Answers   Sodexo,


Four Members A,B,C,D are playing a game .A person losing a game should double the amount of others .B,C,D are losing in order after three games .The amount after 3 games are A&B having 40,D is having 16&C 80. Each questions carry one mark: a) who started with small amount of money? b) who started with greatest amount of money? c) what amount did B have?

3 Answers   Cognizant, CTS,


A telephone cable is to be run from a junction point on the bank of a river 900 meters wide to an office that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river. (a) 450 (b) 1800 (c) 2800 (d) 2100 (e) 2700

7 Answers   TCS,


Consider a function which, for a given whole number n, returns the number of ones required when writing out all numbers between 0 and n. For example, f(13)=6. Notice that f(1)=1. What is the next largest n such that f(n)=n?

4 Answers   Google, WW,


if today is monday after 61 days it will be?

12 Answers   Solartis,






Q2) Paul the octopus who has been forecasting the outcome of FIFA world cup matches with tremendous accuracy has now been invited to predict ICC world cup matches in 2011. We will assume that the world cup contenders have been divided into 2 groups of 9 teams each. Each team in a group plays the other teams in the group. The top two teams from each group enter the semi finals ( after which the winner is decided by knockout). However, Paul has a soft spot for India and when India plays any team, Paul always backs India. Alas, his predictions on matches involving India are right only 2 out of 3 times. In order to qualify for the semi finals, it is sufficient for India to win 7 of its group matches. What is the probability that India will win the ICC world cup

6 Answers   TCS,


The temperature at Kochi is given by the function: - t2/6+4t+12 where t is the elapsed time since noon. What is the percentage rise (or fall) in temperature between 3.00 PM and 6.00 PM?

3 Answers   TCS,


the sides of a right angle triangle are a & b and the hypoteneous is c.a perpenticular from the vertex divids c in to two segments r & s adjesent respectible to a & b .if a:b=1:3 then what is r:s=?

4 Answers  


The base 5 representation of the decimal number 2048 is _____.

0 Answers   Accenture,


When DB2 is run in IMS environment an application can access data in a) Only DB2 database b) Only IMS database c) Both DB2 & IMS databases d) None of the above

0 Answers  


FULL FORM OF R.O.S.H.A.N

0 Answers  


If DDMUQZM is coded as CENTRAL then RBDJK can be coded as ---------

1 Answers   TCS,


Categories