How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
2675i m searching for steel or rebar weight/meter (d)2/162 this is correct but why used here 162
3 10915I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
2088In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
2322what will be the quantity of following materials in P.C.C for the total area of (100'x70'x 0'4") 1)NO. OF CEMENT BAGS 2)SAND IN CU.FT 3)METTLE IN CU.FT
2654In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
2161please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
1 4703Post New Civil Engineering Questions
How many feet are in 4 square yards?
How to activate isometric axes in cad?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
What are the responsibilities of a construction manager?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
what energized you to complete your course?
In cement concrete how to check a quality of material also proportion of material at site ?
Does VDF add strength to the flooring apart from preventing water ingress?
What is the difference between linear dimension and aligned dimension?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
how to clculate the %of concrete strenght achive after curing?load
What is the ideal size of the living room ranges from small to large size?
What is the compressive strength of fly ash bricks?