i need a labour rates of all civil works ? eg) brick,pcc, smm, inner plaster,outer plaster,centering, bar-bending. and also need all material rates latest?
1 3542Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
2119Post New Civil Engineering Questions
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
What is bmc stands for in bmc software?
why we are using stub column..? is it possible to construct steel stub column..?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How can we demolish concrete beams?
Civil engineering material testing Standard results
how can we construct building without foundation providing only grade beam at ground level
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
How to decide/consider the grade of bitumen for dbm.
types of laps in column
why the profile of shell of natural draught cooling tower is hyperabolic.
plz.show development and anchorage length in simple diagram.
What are the benefits of rcc pipes over steel designed pipes?