Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
1936I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
MES,
2083How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
3419Post New Civil Engineering Questions
Slump Values for works?
why is M30 grade Concrete use for Foothing & Column M50
What will you do if a portion of load bearing wall collapses under your supervision?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
How to do base isolation for RC framed structure using ETABS software?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
What do you mean by honeycomb in concrete?
What is fineness modulus ? and its sieve # ?
what is shuttering co efficient?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
rimmer in pile foundation
What is meant by cad?
Ratio for 4500 psi concrete
what is that one cub metre plaster in cemant and fine sand
How much material will consume for following specification water tank (9*7.5*6 feet)?