If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
ABC,
2174i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
1909Post New Civil Engineering Questions
how much need sand and cement for 1 cft roof construction?
Questions related to civil.engg in company
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
how to calculate reinforcment in staircase cranked beam?
For fine aggregate which is most suitable River sand or crusher sand & why ?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
what is column foundation
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what is the function of GSB all class ?
What is the snap size in civil and how can we create it?
How to do base isolation using ETABS software?
What is the basic difference between OPC
What are the responsibilities of a site manager?
What you understand by building codes?