How do we get this formula Ast=(0.5Fck/Fy) into(1-(in sqrt(1-((4.6Mu)/Fck.bd^2))into bd Fck=grade of cement i.e M25, M20 Fy=grade of steel i.e.Fe415,Fe250 Mu=moment b=width d=depth
1 20778How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
Suda,
1 586832mm bar column lapping we use welding binding what is dimension of welding as per stander code?
RMC,
2 5042how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
37361 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
2 11243Post New Civil Engineering Questions
will fix foundation bolts at site with out template is there any procedure?
How you can use different dimension tools in cad? What are the different dimensions available?
which method is used in semi-rigid connection design??
what is tension & compression of steel bending.
What is Architect-Prepared Contract?
What is factor not to be taken in consideration in mix design?
What goals do you have in your career?
how much used soil in 1 brick of standard size?
questions with answers to face an interview of an civil engineer regarding RCC buidings
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
What is the Null Point of chimney in Power Plant
why we use 19x9x9and 20x10x10 but not other
What are some structures that may be subjected to fatigue?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
what is Short bored pile foundation.