when we workout quantities of reinforcement steel , whate are the critari of lap length for column
4 9278How to Determine the Quantity of Cement Sand , Aggregete and Reinforcement Bars in 30 feet X 40 Feet and Height is 4 Feet .
1 6603A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
2228Post New Civil Engineering Questions
undistributed samples are obtained by
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
Define What is the tallest man made structure in the world?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
How much quantity of cement,sand,stone used to build 1 cum of cc road??
what is m30 in concrete tiles
How to calculate chejja reinforcement
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
how many kg of 20mm, 10mm, dust available in one ton stone boulder
for pretensioning which will yield first and same for post tensioning?
How is calculate the cube molt
What is unit weight of normal concrete?
Define What are the materials used in building a gravity dam?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?