Teradata (490)
Business Objects (875)
Cognos (1143)
Informatica (2428)
Crystal Enterprise Suite (30)
Actuate (46)
Ab Initio (442)
Data Stage (917)
SAS (1049)
Micro Strategy (282)
ETL (315)
OBIEE (92)
IBM Cognos TM1 (55)
Amazon Redshift (62)
Data Warehouse General (749) Can we provide Package level security to two different groups i.e for finace and HR depts should access only their data??
2 8413Hi guys, Design job sequence, we have 3 sources, in that 1st source in abort then only run the remaining sources.. How please design the job. Thanks.
IBM,
2 7077Hi guys, In sequencer job, we have 3 sources, in that 1st source have some records, Here requirement is 1st source records are 100 then only run the job otherwise total job will abort... How to calculate this. please design the job. Thanks.
IBM,
1 5993Hi guys, please design job for this, MY INPUT IS COMPANY,LOCATION IBM,CHENNAI IBM,HYDRABAD IBM,PUNE IBM,BANGLOORE TCS,CHENNAI TCS,MUMBAI TCS,BANGLOORE WIPRO,HYDRABAD WIPRO,CHENNAI HSBC,PUNE MY OUTPUT IS COMPANY,LOCATION,COUNT IBM,chennai,hydrabad,pune,banglore,4 TCS,chennai,mumbai,bangloore,3 WIPRO,hydrabad,chennai,2 HSBC,pune,1 Thanks
IBM,
3 9315Hi guys, 7. how to get this output i/p col1,col2 101,a 102,b 103,c 104,d o/p col1,col2 101,d 102,c 103,b 104,a Thanks
2 9804explain about completely flow of sequencers technicaly,without using example??explain about lookup,nullhandling?
CGI,
1 2595Can we use two different sources in webirich client to create A report ? Like universe and excel etc...
PWC,
3 8022i am pursuing mca and i want to do tera data .so plz suggest me the best institue in hydrabad who teach real tym scenerio.
1 4623
draw informatica architecture 8.6 ?
Just Completed the informatica Certification ,for Dumps please email me on infamaddy@gmail.com i will send it to you
Source has 2 columns: USA,NewYork INDIA,MUMBAI INDIA,DELHI UDS,CHICAGO INDIA,PUNE i want data in target like below: INDIA,MUMBAI1 INDIA,DELHI2 INDIA,PUNE3 USA,NEWYORK1 USA,CHICAGO2
Hi Friends, Please send me Teradata Materials for certifications Thanks in advance !!
I have two different source structure tables, but I want to load into single target table? How do I go about it? Explain in detail through mapping flow.
Name at least 5 different types of transformations used in mapping design and state the use of each.?
Hi, Does anybody has lastest SAS certification(base, adv., clinical)dumps,if anybody has please email me at mailtorajani76@gmail.com. Thanks
how we can create a FLAG datasets? Ex:-ID age_group no_persons 1 to 10 10 to 20 3 11 to 20 21 to 30 7 21 to 3o 31 to 40 5
If I wanted to run a TPump job only once per day - basically working on a file that is produced once per day - how would you set up the parameters for that sort of job ?
What is dimensional table?
Have you have ever worked in unix environment and why it is useful in datastage?
what are the names of the reports that you prepared?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
What is a rollup component? Explain about it.
Demonstrate experience in maintaining quality process standards?