Teradata (490)
Business Objects (875)
Cognos (1143)
Informatica (2428)
Crystal Enterprise Suite (30)
Actuate (46)
Ab Initio (442)
Data Stage (917)
SAS (1049)
Micro Strategy (282)
ETL (315)
OBIEE (92)
IBM Cognos TM1 (55)
Amazon Redshift (62)
Data Warehouse General (749) How do I CREATE an external dataset with sas code? I would like to create within a sascode a non-exsistent textfile on the host. So I am not forced to create the file befor filling it.
2 4915Create a mapping which contains 2 target tables. When the session runs for the first time it shud load Target table 1 and when it runs for second time it shud load Target table 2.
TCS,
7 14701source name sal aaaa 2000 bbbb 3000 abcd 5000 Target name sal aaaa 2000 bbbb 3000 abcd 5000 total 10000 how to get total as new row and sum as 10000 thanks
4 7895If a table contains 100 records we have to fetch 50-100 records from source to target?how
CSC,
7 12216Hi, I have Cognos 7.0 Impromptu reports and these reports have been created with the Mainframe datasource. Now the business needs these reports should be upgraded but with Oracle datasource. So what's the idea, first we should migrate these reports into ReportNet? then in that case what we will do with the Impromptu Catalog? Second, suppose we need to migrate these reports into Cognos 8 (may be 8.4) then how we will do that? do we need to create a FM Model for these reports. Please advice!
1954
What is the use of code page?
Explain and compare pros and cons of snow flake schemas?
How abinitio eme is segregated?
How big was your fact table
What are the enhancements made in datastage 7.5 compare with 7.0?
How can we use mapping variables in informatica? Where do we use them?
What is data analytics in simple terms?
How to update or delete the rows in a target, which do not have key fields?
Explain the data types present in bo n wht happens if we implement view in the designer n report?
How do you load first and last records into target table? How many ways are there to do it? Explain through mapping flows.
What is a macro routine?
If you could design your ideal job, what would it look like?
What are parallel querys and query hints?
What is the use of stored procedures in teradata?
How do you convert single row from source into three rows into target?