Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
2028We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.
1996how we can calculate the range selection time in mobile communication? or channel searching time?
2296Q.Large no of thyristors are used in HVDC transmission to improve______ a) current rating b) voltage rating c) Thyristers are available at high ratings d)
5 8850If the time delay of relay with TMS setting 0.1 is 10 sec, then what is the time delaty when the TMS setting is changed to 0.5
1 6016Which type of power plant is more easier to produce electrical power at economical condition?
8 11294Post New HAL Interview Questions
What is wcf used for?
What information is defined in the software catalog?
Is solaris a linux?
How to calculate the difference between two dates?
Can an int be negative c#?
Is the Ross Stores your ideal company?
What are dependency properties in silverlight?
How to move or copy the project parameter or project object to my sandbox?
Explain ginning?
What is the use of tdq and tsq?
What are the functions of the Quality Assurance Group (QAG)?
Why do we code s9 (4) comp. Inspite of knowing comp-3 will occupy less space?
Why do you think PPC is important in digital marketing?
Can a constructor call the constructor of parent class?
What is data store? How to create data store?