IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace.
1 4083why our indian system choose the 230 volt for single phase&415 for 3-phase voltage,in forign side 110 volt is used what is the difference
4 20543HI....HOW CAN BE MESARED THE VALVE OF NEUTRAL GROUND RESISTOR WHIC IS LOCATED AT SWICHGEAR ON GENERATOR SIDE....
2085Post New Jindal Interview Questions
What is the difference between war and ear?
Where the sql logs gets stored? : sql server database administration
Why do we need SAP PI system? What are the key capabilities provided by PI system?
What Is Encryption?
What support do we need from pega’s professional services?
What is the enumerate() function in python?
what is escalation?how it is done?
When entering foreign currency fi transactions describe the various ways in which the exchange rate is derived by sap?
What is struts framework in java?
What is the function of style?
ssc cgl 2010 may tax assistant ki cut of kya hogi
How to use tomcat server as an http server?
Explain how you can build ast (abstract syntax trees) in groovy from string?
How to get requested path in laravel?
For what purpose steplib and joblib are used ?