Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
1960Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1940Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1344Post New HMK Interview Questions
How converted the natural coding for adabas
What is the non linear data structure?
What is two plant-based cotton source?
How to use of return keywords in python?
What are the protections for safe running of electric generator?
Which sorting algorithm is best in java?
What is database migration? And how to use it to add insert initial data to database?
How to make your main form fill up the Desk Top space?
How do I trace sql profiler?
How do you copy just the formatting in excel?
Differentiate between static and dynamic step loops?
What is the lower limit of break-down voltage of converter transformer.
Why should I go to exchange 2003 now?
How can Contexts be created?
Can you please explain the difference between system.string and system.stringbuilder classes?