Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
1960Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1940Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1344Post New HMK Electrical Engineering Interview Questions
Tell me something about cloud ecosystem?
What are the advantages/benefits of using openstack?
When will the ADSL WIC be available?
Differences between Oracle 9i and 10g (Probably in terms of SQL and PL/SQL)?
Various excel bi add ins?
Explain capacitance?
What is Report Repository?
Please explain what is “asynchronous” communication in sql server service broker?
How do I remove the underline from a hyperlink?
Is it possible to remove old files in the movechunk directory?
What is a data structure definition?
How can we update a record in the target table without using update strategy?
when the ABC's personal bank to to his business bank money transferred(paid) then how to pass the entry.
What is the use of dictionary in python?
What are transport methods in soap?