Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
2009Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1987Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1388Post New HMK Interview Questions
How do you enable tracing in UiPath?
Explain the working of templates?
How many types of size categories and data classes are there?
Explain about jump start wizard versus standard wizard in salesforce?
What is normalization of database? What are its benefits?
What is difference between array and pointer in c?
List and explain different types of directive available in angularjs?
When was the wordpress released initially?
Why steel is preferred for construction of aircraft?
Tell something about the query language used in Cassandra Database?
What is the file extension used for hibernate mapping file and hibernate configuration file?
Why synchorised generators are used for the production of electricity?
What is func delegate in c#?
What is the difference between a "copy constructor" and an "assignment operator" in C++?
How do I make synchronous data calls in actionscript? : adobe flex action script