Answer Posted / vijay
phese wire indicate a voltage phase and earth but nutral
and earth indicate a diffrece a voltage zero
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?
In Dyn11 power transformer if any one of the 3 phases connected to earth in star connected side then please explain effect of the current flow in delta connected side of transformer.(In this case if one phase is shorted to ground in star connected side then we observe the current flow in two phases only not three phases in delta connected primary side. Please explain why it is so?)
How to use earthing on shipments.
I am applying for NTPC examination.Can we please provide previous paper to my mail prasad.chintala108340@gmail.com
The windings of a transformer are divided into several coils, because?
Differentiate between induced emf and self inductance?
What is mason's gain formula?
what is KSR type transmission tower? What is LSR type transmission tower?
why wire sizes are 3/29 or 7/29 and why not wire sizes are 2/29 or 6/29?
What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)
Calculate torque developed by the 3-phase, 5 H.P., 4 pole induction motor runs at 1500 rpm A 23 N-m B 21 N-m C 10 N-m D 0 N-m
explanation of mesh bus bars
What is meant by vector group
What is method of calculating the fault current for a MDB, 50KW, 3PH, 415V, 50HZ?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.