what are IS code for
M20, 25, etc
Answer Posted / joseph ravi kiran
THE IS CODE FOR M20 & M25 IS ...IS 456:2000.
THIS CODE GIVES THE PROCEDURE OF MIX DESIGN.
| Is This Answer Correct ? | 119 Yes | 26 No |
Post New Answer View All Answers
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
Why are steel plates inserted inside bearings in elastomeric bearing?
Spider cracks occur in beam bottom due to––
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
what are the challenges of being a team leader and a supervisor?
what is the effect of duration of earth quake on framed structures ?
What is the quantity of cement in mix m20 concrete?
What goals do you have in your career?
What are the advantages of cad software’s?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
how to calculate steel for slab or footings?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.