What do u do if the bug that u found is not accepted by the
developer and hez saying its not reproducable.Note:The
developer is in the onsite location
Answer Posted / ashok
As a tester when we found a bug, but the developer is not
ready to accept it, especially the dev from On-Site, we
will check the below things,
1.Environment
2.Build No and (Ex- Dev from US the build no is 9.2 here in
india(Tester) the build no is 9.1)
3.Check the fixed bug is deployed or not.
Again we found same bug, take a screen shot and sent it to
dev with Reqirement and CC to TL and PM.
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Explain Test Plan with example? Explain following in the test plan with examples What is being tested? What are pass/fail criteria? When will each test occur? What Hardware & Software environment is required? What features must be tested? What features will not be tested? What are the responsibilities of individuals & organisation in the project?
What do you mean by Cause Effect Graphing? in which standard its mentioned?
what is the difference between test case and result matrix
What a team leader will test first when s/he will get new module to test?
Write UI Test case, Integration Test case, Functional Test case & Performance Test case for the File Menu for MS-Word?
When we use integration testing for any new system so why we required system testing.
What’s the difference between verification and validation in testing?
What are quality assurance and quality control?
HI GUYS,, I HAVE 3 YEARS OF EXP IN MANUAL TESTING...NEXT MONTH ONWARDS I WORK FOR MOBILE TESTING....PLS SUGGEST ME WHAT I LEARN FOR TRAING,, MOBILE TESTING OR ANDROID....FOR MOBILE TESTERS NEED ANDROID(IFONE) DEVOLOPMENT KNOWLEDGE OR NOT? EXPLAIN CLEARLY
what will be verification and validation test cases for yahoo login page (only functional test cases)? Please explain in details.
PLEASE CAN ANYONE SEND ME THE TEST SCENARIO BASED QUESTIONS FOR 3+ EXPERIENCE IN MANUAL TESTING
Do you know anything about Set Top Boxes?
What is mean by Schedule report who is the responsible for generated that one ?
Diffrernce between client server testing and web server testing.
In a systen design to work out the tax to be paid: An employee has Rs 4000 of salary tax free. the next Rs 1500 is taxed at 10% , the next Rs 28000 is taxed at 22% , any further amount is taxed at 40% , the nearest whole Rs, which of these is a valid boundary value analysis test case ???? a)Rs 1500 b)Rs 32001 c)Rs 33501 d) Rs 28000.