Answer Posted / raj
Study requirements
Prepare test plan and identify the functionalities to be
tested in cycle
Identify the test approach
Identify test points and complexity of each test point.
Calculate the time required by one resource to complete one
function and based on this complete the estimation. Plan
the cycles based on the type of testing for
example :functional/system testing and then regression and
UAT.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to identify metrics, integrity level, identify risks and identify security issues in ieee 829 standard explain with examples??
What is code walkthrough?
Could you tell me two things you did in your previous assignment (QA/Testing related hopefully) that you are proud of?
Explain cmm?
What is binary portability testing?
What are the tables in testplans
Which institute in hyderabad is good for ETL testing? Please suggest
wht type of intersting things sqa have or what is intersting abt sqa and how it will be advanategous for us as a sqa engineer?
We have a WISPr application making an authentication request to a server running an authentication module. The client application is sending the User--Agent value, but the authentication application logs the User-Agent value as null, please explain the steps i should take to troubleshoot the issue. Please mention the steps by applying your knowledge of the OSI model.
Please, list many things You’ll do (effort) as a SQA Tester, in this Company software project from the idea making of the specification, till that software released!
How to test and to get the difference between two images which is in the same window?
Define test strategy.
What are the differences between test strategy and test plan?
What is bug?
how cani do requirement testing using some testcase