Which of the following is MOST likely to result from a
business process reengineering (BPR) project?

A. An increased number of people using technology

B. Significant cost savings, through a reduction in the
complexity of information technology

C. A weaker organizational structures and less accountability

D. Increased information protection (IP) risk will increase

Answer Posted / guest

Answer: A

A BPR project more often leads to an increased number of
people using technology, and this would be a cause for
concern. As BPR is often technology oriented, and this
technology is usually more complex and volatile than in the
past, cost savings do not often materialize in this area.
There is no reason for IP to conflict with a BPR project,
unless the project is not run properly.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

WHICH OF THE FOLLOWING IS OFTEN AN ADVANTAGE OF USING PROTOTYPING GOR DYDTEM DVELOPMENT

2838


purchase orders issued to vendors have been authorized as per the authorization matrix

1089