Answer Posted / vikrant gokul labhane
NO,We can not step up DC power using transformer.
DC having both potantial (ie.+ve &-ve )and when it is
connected to primary wdg. of transformer ,primary get short
ckt.& burned (Heat wiil produced).
BUT THERE IS ANOTHER WAY -
* First convert DC power into AC power by using inverters &
after then that AC power can convert into DC power by
rectifire at suitable range as you required.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
CBCT selection
In CTs tan delta point should be earthed , what is the reason behind it?
How to calculate the efficiency of Turbo Generator(Alternator) in general....?
hello everybody. what does an abnormal stator winding impedance or dc resistance show? thanx
list the advantages of RCCB over other circuit breakers?
Explain about retrofitting of machine tool.
while doing high voltage test on 11kv/433 distribution transformer why we only give 28 kv on hv side and 3kv on lv side for power transformers what is the value what factors it depends
What are the basic component of a cro?
DG SET BLOCK DIGRAM
What Is Connection APFC Panel In Compony.
The 3 phase Delta connection RB=440V, BY=350V,.......* is Line to Line voltage RY= ? And Formula....?
how u select control transformer for a mccb panels or any panels?for expample we hav 440 volts maim supply and control volts is 230v?
How to decide whether A / B / C / D curve type MCB should be used?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
hi frnz,can somebody give me any project work? i am a 2nd year student & interested in practical works...plz give me some projects