What is the use of the Test Director software?
Answer Posted / arya varun
Test Director has got 4 tabs
1.Requirement Tab (This is for writing the requirements
2.Test Plan Tab(This is for writing test cases and we can
map test cases to corresponding requirements)
3.Test Lab Tab (This is used for runnning the test cases)
4.Defects Tab (This is used for defect management)
So test direct comes into picture right from reguirement to
defect management
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?
Can anyone tell me where i can Download free full version of test director
How can we create our own defect template from test director? Is it possible in test director?
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?
How do you ensure that there are no duplication of bugs in Test Director?
Can we map the defects directly to the requirements (not thru the test cases) in the test director?
Explain about failure options in TD
How can we export multiple test cases from td in a single go?
How to identify test cases with no scheduled test runs.
How you integrated your automated scripts with testdirector?
Explain the project tree in test director?
Is QC comes under functional testing or not?
How do I run reports from test director?
Is there any possibility to restrict duplication of defects being created in td?