What is differance between qc & Qa? in mechanical field.
Answer Posted / vinayan
DEAR,
QC- means quality control, in which u must conntrol the
quality parameters
QA- means quality assurance, through QC u can ensure QA
| Is This Answer Correct ? | 11 Yes | 18 No |
Post New Answer View All Answers
What is the purpose of increasing the pressure on the F.O. system of the engine?
sir,i am golng to attend BHEL supervisor trainee personal interview on 11 sept.anyone share me that how could i perform well in interview& what they would expect from me. thank you.
with the aid of schematic and block diagram describe the control system involved in a student passing a control system engineering examination.use standard terminologies and specify all the system component involved.
When was the first space rocket built?
What is the relation between the thickness of the thermal boundary layer and the depth of the hydrodynamic boundary layer?
sir,i m mech. engg final year student, please send me technical test question with answer for gail,bhel,sail& also useful for other psu exam. thank you....
Which questions will be asked for mechanical design Engineer position in GE?? plz give me reply it's urgent...
Dear Sir, Please send me the questions frequently asked during bhel persoal interview for supervisor trainee With worm regards, Alok Kumar Rout e-mail id- rjdalok22@gmail.com
What is the indication of leaking starting valve of an engine?
Give one example of metal classified as per structure as bcc, fcc, hcp and ccp.
can a deareator be placed at any height with care that suction (NPSH) for feed pump is satisfied
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is the flow of steam in an impulse turbine?
Why must we pay attention when we drain steam in steam turbine. What factors are observed?
What is welding?