why is the vector group analysis done in transformer tests
Answer Posted / sachin
Vector group analysis done in transformer test, so that we
can check the phase displacment and polarity of the
transformer.
| Is This Answer Correct ? | 119 Yes | 17 No |
Post New Answer View All Answers
one split ac how can told of this ac which Tr tell me us
What is the physical significance of phase.. i.e. what is exactly the meaning in layman's language.. 1 phase, 3 phase etc ???
Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?
what is the relationship between phase & neutral
in HT service 3ph 4 wire service Y-phase voltage shows zero . whether it is meter fault? or what be the reason ? if y-ph voltage zero ,can current is recorded? reasons for failure?
what happen if the load connected to the induction motor is taken away? the same question for synchoronous generator in synch i think that the the exitation voltage will appear on the terminal only if so plz answer me
why the making current is more than then the breaking current and if its true then its about a controling circuit or breaker power contact points
Dear all, I want to use Induction motor to open and close a 1 ton door. How much power do I need. Thanks
What do you mean by per capita requirement of electrical energy in india
What is dynamo function in DG sets and draw block diagram?
EXPLAIN THE ESSENTIAL FACTORS WHICH INFLUENCES THE CHOICE OF SITE FOR A HYDRO ELECTRIC POWER PLANT
what is the difference between gas group b and gas group c electrical equipment construction wise?
What is the real function of reverse power relay in generator panel while syncronising?
How will calculate losses in an multi core Aluminium LT cable of different sizes & upto what length we can use a LT Cable ?
Can we use BS 6651 and BS EN 62305 standards for computer room lightning ptotection in substation?