why is the vector group analysis done in transformer tests
Answer Posted / sachin
Vector group analysis done in transformer test, so that we
can check the phase displacment and polarity of the
transformer.
| Is This Answer Correct ? | 119 Yes | 17 No |
Post New Answer View All Answers
exolain the star delta connection
What type of fittings and electrical accessories can be install in radiation area ?
How is the gain affected by the introduction of feedback in a control system.
what is errection pcbs?
why we can stote dc? why we cant store ac?
How many turns are there in primary winding? (In Transformer)
May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?
Determine the BTU size of an aircon for 20 sq metre room
what is meant by residual over voltage & residual earth fault ?
i want some interview related questions with their answers which can help for attend the interviews...
Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss
why the field winding in dc motor is not short circuited eventhough dc supply is applied across the winding
What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA
How to know th details about an electrical Drawing ? Please mention the easy method.
Why ground terminal is used in pot meter 10k ohms