Answer Posted / ramendra verma
In Repitative Manufacturing.we dont have make the BOM
frequently.The change in production process is less.It is
Quantity based planing.Material back flushing is after the
process run.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
• How are basic order dates determined?
What is the use of mrp list?
What is it 41 used for?
What is Backflush, the places where the backflush is used?
What is costing? How it is affected the pp?
Define mrp group
What is meaning of customized reports?
define variable cost
Mention what are the t-codes for creating, changing and summarizing bom?
What is Material status and which view of the material master it is available?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Can't one material be assigned to more than one operation in a routing, why?
How to insert an inspection checkpoint at the end of an operation?
How did you configure the payscale structure?
One component we can assign to workcenter at routing