What is the difference between an activity of QA and QC?
Answer Posted / padmas
Any activity of QA is assuring the Quality of the specific
product,which is already achieved at certain level.Once the
level of quality is ensured,QA will suggest the ways to
improve it to next hight levels of quality using established
QMS methodologies, as per the product development progress
and time to market strategies.
Whereas QC is, once the accepted level of Quality is
achieved, QC activity maintains it using the controlling
techniques to sustain at the same level for certain period
of time.As the durability prolongs at definite intervals of
time,QC measures the quality of the product to control the
accepted level of quality.QC activity is more of periodic
checks and implementation of methods to controlling the
product quality through tools and techniques.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is quality audit?
How to perform SQL inject test for a login page using OWASP ZAP proxy security testing tool
What are the table contents in testplans and test cases?
insurance domain interview questions ,i done project on insurance (manual testing)
what is angle testing
What is conformance testing?
Write down the differences between the responsibilities of qa and programmers?
When we should continue testing?
What should your qa documents include?
What is the testing lifecycle?
I want appear the ISTQB fundation level in june '08. For this i require previous question sets or glossaries.pls email me if any one have previous question sets or glossaries. my mail id is- jayanta_bncoe@yahoo.com Thanks jayanta
What is negative testing? How is it different from positive testing?
In one project, How much “%” effort made by SQA Tester? e.g. : developer = 35%, manager = 10%, etc.
When to start qa in a project?
What is the strategy for automation test plan?