can we load Power capicitors on DG sets?
Answer Posted / suneetha
A DG is used to supply power when there is power failure
and not for power factor correction but a Power Capacitor
is mainly used for power factor correction and is usually
kept near unity to avoid penality.
Is This Answer Correct ? | 15 Yes | 6 No |
Post New Answer View All Answers
how can we select the type of wire.what factors we have to look on it , do we have some formula to calculate it. please guide me on it
can anyone explain the star-delta motor control wiring ,which wire go where and how they operate?
I want single line diagram for AMF & DG syncronizing panel
How many wall/floor flange will i use in bus duct system if we have in our design a 35th floor building.
Define the overload capacity of the motor?
i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.
explain the what is a drive ? 0 4 which type motor r use in the celling fan..... PCB plannet 2 13 If stator & rotor of a 3-phase induction motor have different no. of poles, will the motor run or not?? types of drives Why dc supply is used for closing and tripping coil of ht breakers. What happen if we use only ups ac supply only. ACC 1 41 how the 3phase induction motor is running in 2phase supply with help of capacitor? 1 33 what is the actual difference betwen constructional details and constructional features? 1 20 how does commutator convert a.c to d.c?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
Can anybody inform me about the pattern of ECIL GET( Graduate Engineers Trainee) interview for Electrical students? Will there be HR round as well? I thought of preparing for 2 to 3 subjects thoroughly. Will it be sufficient? Please share your thoughts.
how cables go in and come out for distribution from the feeder pillar box?
sir i want previous entrance exam papers for written test
what will be project cost for 100 kv transformer connection under oyt scheme.
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?
What are the disadvantages of hydropower?