What compounds are responsible for the odours that come
from wastewater treatment plants?
Answer Posted / vijay
Sewage water contain various compounds like
1.organic compound
2.Nitrogen and phosphorous
3.suspended solids and many more
The organic compound such as protein, carbohydrate, fats
are responsible for the pungent smelling from the sewage
water.when protein and fats starts to decay in the open
environment,that inturn cause pungent odour.
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
i am a student of thapar university final year.can anybody please help me with the exam pattern of the companies:engineers india ltd. ; iocl ; UOP, HPCL. If psbl plz send me the previous years questions on this email id k_arora1987@yahoo.com. i d be really greatful
Given, T1=600C, constant temperature of wall 800 , length of wit exchanger L=3m, dia=25 mm, Cp=14.91 KJ/kg.K, density ρ=914 kg/m3,mean velocity vm= 2 m/s, film heat transfer coefficient hf=72 Kcal/h.m2.K, what is the outlet temperature?
What does the catalytic converter on an automobile do?
PLEASE ANY ONE READ THIS MESSAGE ANSWER ME AT MY EMAIL ID surendrasaroj18@gmail.com sir i am prepairing for section engineer exam taken by railway my branch is chemical engineering i want previous paper of chemical engineering of section engineer exam taken by railway. please answer me as soon as possible thankyou
What is a good source of information for the design of pressure vessels?
Define pcbs?
Explain can large temperature differences in vaporizers cause operational problems?
MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)
What is the difference between horizontal and vertical heat exchanger?
Explain the factors involved in considering the choice of dry screw compressor?
How can one quickly estimate the additional pressure drop to be introduced with more tube passes?
Is it advisable to cool a fin fan by spraying demineralized water on it?
Is four stage graphite steam jet ejector is possible. Any body can provide its design
How much waterproofing compound in one Sqm Plastering (thick.12mm)
What are some of the consequences of an undersized kettle type reboiler?