Method of findingthe dry ingredient quantity of 1 m3
concrete.
Post New Answer View All Answers
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
how to calculate steel for slab or footings?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
dialation means
When was the first motorway built in england?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
sir how can we find the cement and sand required for making 4" drop
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
States some of the tool bars used in cad?
on what basis the partial factor of safety are decided? form the load combinations
What is meant by Crystal Concrete?
Trapezoidal section footing calculation of Volume & its Area
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation