VFD – variable frequency drive..
VFD is useful in energy saving because it reduces the
motor speed as demand decreases.When the speed is reduced
the power consumption Will also reduce because ,
Power = (speed)3 {cube of speed}
For example if the speed is reduced to 80% of the maximum
value the power consumed will be reduced by 50%
Power consumed = (0.8)3 = 0.512 = 51.2%
| Is This Answer Correct ? | 108 Yes | 8 No |
Post New Answer View All Answers
why capacitive load is not used in routine life????any reason is there ??????
can i use 4 number of circuit breaker as single phase manual change over switch? if yes then how plz also send ckt diagram at nazimzamurad@gmail.com
what is static frequency converter?what is the function...of sfc...?
what is mean by Digital Logic Meter (DLM)
My question is whether bellow formula is correct to find bus size for 46kA for 0.5 second & what is RT in bellow formula. formula to calculate the size of busbar to withstand the thermal stresses due to currents with duration of 0.2 sec to 5 sec. Sp = RT( I x I x t) / K Where Sp – is the cross sectional area of bus bar in millimeters. I - is the value of AC fault current. t - is the operating time of disconnecting device in seconds. K – is the factor depending on the material of the conductor, insulation and initial and final temperature. Value of ‘k’ for copper is 143.
What is Fire Panel ? How it works ?
can anybody send the rrb chennai &rrb bopal question papers of 2006&2007.My exam is on 12 oct 2008.Its urgent
what is the VA(Volt-amphere)? define with calculation?
What are the factor to be consider for CT selection in 132kV substation?
WHY L-G FAULT IS MORE SEVERE IN TERMS OF RRRV?
What is the meaning of C1, C61, C91 cable
What is accuracy of a measurement?
HOW TO WRITE A QUENTION ANSWER? I MEAN SHORT OR LENGHTHY ? OR FROM THE BOOK AS BOOK..... SOME TIME WE GIVE A ANS FROM THE BOOK AS LIKE BOOK ND WE GET MINIMUM 60% MARKS OR MORE THEN....... THEN HOW TO FILL THE Q-PAPER?
(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?
What is the rate of WCT on the Electrical Contracts comprising of DG Sets and Civil Works in Delhi ?