HOW MANY LEVELS CAN BE USED IN DRILL THROUGH REPORTS

Answer Posted / joydeep

I completely disagree with srinivas.
the question here is regarding drill thorugh reports. and
there are no levels in drill throughs. they are completely
different reports. we can have as many drill throughs as
possible if it makes sense to create that many drill
throughs.

ex: if we have a report on the year level then we can drill
through on the year and then go to a different report at
the monthe level same way we can add drill through in the
second report which is at month level to drill through to a
different report that is at the day level and so on. so we
can have as many drill through reports as possible as far
as it makes sense.

Is This Answer Correct ?    34 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the use of powerhouse?

614


what are the features in cognos8ui

1565


how to create cubes in transformer ?

622


where you can save the report net documentation in our local system?

644


What are the considerations regarding performance kept in mind while setting up cognos?

567






WHAT IS METRIC STUDIO?WHAT IS SCORE CARDS HOW TO IMPLEMENT IT AND WHAT IS THE USE OF SCORE CARD?

5988


how you migrate reports to cognos 8 from previous versions?

634


what is the difference between filter and condition?

608


whats the difference between previous version of cognos and cognos 8 BI?

4758


Hi Buddies...i am lalitha. i am willing to appear for cognos bi-author certification. can anyone of you send me cognos dump. please please help me.

1482


How to do Performence Tunning in Cognos Reports?

2077


What are the two types of framework manager?

687


How Metrics Studio is better than Report Studio?

2034


Can you define folder?

565


Can the expiration parameter of 365 in the cognos 8 configuration how to increase common symmetric key lifetime in days

3160