how many tasks are there in informatica ?
Answer Posted / purva
Tasks in Informatica can be categorized as,
1. Assignment Task
2. Command Task
3. Control
4. Decision
5. Email
6. Event-Raise
7. Event- Wait
8. Session
9. Timer
| Is This Answer Correct ? | 74 Yes | 5 No |
Post New Answer View All Answers
How many types of sessions are there in informatica.please explain them?
Performance tuning in UNIX for informatica mappings?
Explain direct and indirect flat file loading (source file type) - informatica
What is the difference between a connected look up and unconnected lookup?
What is a snowflake schema?
In which transformation you cannot drag ports into it?
I am new to informatica and learning it,can anybody please tell me how we receive source as flat file in informatica,from where we get this flat file?
define galaxy repository in informatica
design of staging area?
What is option by which we can run all the sessions in a batch simultaneously?
Can you generate sequence numbers without using the sequence generator transformation?
What is the need for an etl tool?
Is it possible to define a single node as a Gateway node as well as worker node?
in reporting we add some new objects,how we get the count of the newly added objects to the report
What is the main purpose of Unconnected lookup other than updating slowly changing dimensions? or In which case u use Unconnected lookup?