If a background job runs more than the time it should be
completed normally then what are the actions to be performed?
Answer Posted / raghu chukkapalli
I think we need to check other system parameters and decide
why its taking more time. Check ST01,02,04,06.
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
hi friends, in sap screen with 000 client i unable to logon,with 001 client i can login but i want to log on with 000 client how i can loggin with 000 client intial screen ,please can u help me
What is oracle Architecture?
At o.s level where to check for system logs of sap application?
How should I set priority for Printing say like user, teamlead, project manager?
What is the difference between developer trace, system log and system trace?
What are the pre requisite for the SAP Installation?
How to set predecessor relationship between two transport requests?
Using Tc SGEN I have generated 74% job and later I have terminated the job. I wish to start generating from where it stopped I have refreshed but to no chance, nothing was done. How should I further proceed so as to complete the remaining job?
What is transport layer and domain controller? In which system you have create domain control?
How you connect ECC to EP?
How do you check the users logs in your system and how many sessions each user is generating?
how can i change access to a user who is having access for SPRO display only to change access in sPro
What is GRIR, GRIR effect, why it is imp, How it is analysed, What is expected out GRIR, What is auto write off & Manual GRIR write off?
What are the different modules of SAP?
What is the purpose of table tadir?