After you have completed the first phase of running
the 'Test Cases' in TD, now that you have set the status of
each step as Pass/Fail. How will you run the same 'Test
Cases' for regression testing (say for 2rd or 3th build)?
Answer Posted / ashish
Instead of going for new runs on existing test cases, I
will go for a new Test Set and add the required test cases
from to be regressed from the Test Plan. The new test set
can be named as 'build <number>'.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How can we export multiple test cases from td in a single go?
What is the difference between winrunner and test director?
Can we upload test cases from an excel sheet into test director?
What is the main purpose of storing requirements in test director?
Can anyone tell me where i can Download free full version of test director
What is the use of test lab in test director?
What r the views in testdirector?
How to identify test cases with no scheduled test runs.
Explain the project tree in test director?
Can you retrieve a test case once you have deleted them in test director?
What is the difference between master test plan and test plan?
What databases can test director reside on?
How do we attach excel sheet with test director?
Explain about failure options in TD
How to use testdirector in real time projects?