A and B combinely can do a work in 4 days. If A alone can
do a piece of work 6 days. In how many days B alone can do?
a) 8 days b) 6 days c)10 days d) 12 days
Answer Posted / harsha
can somebody give steps
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
FIND the next number in the series 11,112,1124,11248,--
hoe 1000000000 can be written as a product of two factors neither of them containing zeros
5) Failure to use null indicator variable when referencing a nullable column will give the following SQLCODE a) +150 b) –001 c) +276 d) +305
There are 4 numbers as 5,8,2,1 Form 4, four digit numbers as A, B and find the sum?
If x,y,z are chosen frm -3,1/2,2 what is the largest value of (x/y)*z*z
A sum 's' is divided into 4 parts. Second person gets Rs 10 more than first.3rd person is Rs 10 more than second, 4th is 10 more than 3rd. How much amount do 1st person get?
A fuel dealer mixes two brands of fuel which cost in the ratio 2:3 A solution of 30% Brand A with Brand B yields profit of 10% when sold at RS 297. What is cost of brand B?
Two trains in the same direction at 50 & 32 kmph respectively. A man in the slower train observes the 15 seconds elapse before the faster train completely passes him. What is the length of faster train ?
epaulette : shoulder :: tiara :
A plane moves from 9? N40? E to 9? N40? W. If the plane starts at 10 am and takes 8 hours to reach the destination, find the local arrival time.
all apscsc question papers
what is diff b//w the singly reinforced beam,doubly reinforced beam?
Three cards are drawn at random from an ordinary pack of cards. Find the probability that they will consist of a king, a queen and an ace.
sir i need rrb secunderabad goodsguard previous exam papers
What is the height of the cone of diameter 12 cm that is formed after melting a sphere of 6 cm diameter?